Long week

May. 24th, 2014 09:47 pm
valarltd: (aisha)
[personal profile] valarltd
It was long and difficult.

I had a day where I looked at Mudd and said "I'm on the 19th hour of my 18 hour bra."

IMG_1134[1]
I helped build this (3 person team)
and have a huge bloodblister on my toe to show for it.
It arrives in a crate big enough to hold a leopard. And has to be assembled from scratch. Its supposed to have a refrigerator, oven, microwave and dishwasher in it. So if you see a Samsung Chef Collection display, know that four people like me built it.

IMG_1121[1]
I also helped build several of these. For reference, these arrive palletized and held with metal straps. The main box is taller than I am, and there are 3 other boxes. That light up top has to be attached, as does the monitor. And the washer and drier have to be moved. A Lot. I have moved a dozen washers and driers this week.

Next week:

Tuesday is setting up 3 TVs at Targets, and a continuity check
Wed is a one TV and a bunch of phone calls
Thursday is a Hallmark inventory and 1 TV set up, about 14 hours worth of ActionLink and 4-5 of RGIS

Tomorrow, I finish edits and write a lot.

June 2022

S M T W T F S
   1234
567891011
12 131415161718
19202122232425
2627282930  

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated Jan. 23rd, 2026 03:09 pm
Powered by Dreamwidth Studios